Roofing OttawaRoofs · Eavestroughs · Repairs 613-851-7831

Roofing Ottawa / Roof replacement

Roof replacement in Ottawa, every layer new

A complete tear-off and a complete new roof system: deck, drip edge, ice and water membrane, underlayment, shingles, flashing and ventilation, on one itemized written price.

Gloved hands nailing a charcoal architectural shingle into place on a new roofCourse by course
Typical time
One to three days for most houses
Shingles
GAF and IKO architectural lines
Warranty
10-year workmanship, plus manufacturer
Permit
Not needed for a like-for-like reshingle

What a new roof includes

A new roof is every layer, not just shingles

The shingle colour is the part you see. These are the parts that decide whether the roof lasts.

Tear-off, never a second layer

We strip every roof we replace down to the deck. Laying new shingles over old ones saves a day, but it buries whatever is wrong with the wood, adds weight to a structure designed around Ottawa's 2.4 kPa ground snow load, and leaves the new shingles lying on an uneven, heat-holding base. On a tear-off we see every sheet of sheathing, and you see it too: we photograph each panel we replace.

The deck

Soft, delaminated or rotted sheathing is cut out back to the rafters and replaced before anything goes on top. The most common culprits we find in Ottawa are the first metre above the eaves (years of ice-dam water), around old plumbing stacks, and under valleys. If the rafters themselves are cracked or sagging, that becomes structural work and needs a permit; we tell you before we touch it.

Drip edge and eave protection

Prefinished metal drip edge goes along the eaves and rakes. At the eaves, a self-adhering ice and water membrane runs from the edge at least 900 mm up the slope and to a line 300 mm inside the wall, the eave protection rule in the Ontario Building Code (9.26.5.1) for a climate like ours. In valleys and around chimneys and skylights we run membrane too, because that is where water concentrates.

Underlayment and starter

A synthetic underlayment covers the rest of the deck, lapped so water always runs over a seam, never into it. A starter strip with a factory sealant line goes along the eaves and rakes, so the first course is glued down at the two edges where wind gets its grip.

Shingles, nailed to the pattern

We install architectural (laminated) shingles from GAF and IKO, the two manufacturers we are certified with. Every shingle is nailed where the manufacturer specifies; a shingle's wind rating, typically ASTM D3161 Class F on these lines, only holds when the nails are in the right place.

Flashing, vents and caps

Chimneys, side walls and skylights get new step and counter flashing rather than a bead of caulking over the old metal. Plumbing stacks get new boots. Ventilation is balanced, intake at the soffits and exhaust at the ridge, and the hips and ridges are finished with matching cap shingles.

Choosing shingles

What to ask for by name

Every quote should name the product line and every accessory. These are the specifications worth comparing.

Class F

Wind rating

ASTM D3161 Class F is a fan test at 110 mph (177 km/h). Many architectural shingles also carry ASTM D7158 Class H.

ASTM D3161 / D7158
900mm

Eave protection

Minimum width of the membrane up from the edge, reaching 300 mm inside the wall line.

OBC 9.26.5.1
3

Bundles per square

Most architectural shingles come three bundles to a 100 sq ft square. Ask how many squares your quote is based on.

Manufacturer packaging
10yr

Workmanship warranty

Our written warranty on the installation, separate from the manufacturer's material warranty.

Roofing Ottawa

Measure it yourself

Size up the job before we arrive

Two quick tools to understand your quote: roof area in squares and bundles, and the slope with the materials it allows.

ToolRoof size

How big is your roof, in squares and bundles?

Roofers price and order by the square (100 sq ft of roof). Measure the outside of the house at the foundation and add the overhang.

Estimate only: slope factor = √(1 + (rise/12)²); waste 10% on gables, 15% on hips; three bundles per square for most architectural shingles.

ToolPitch finder

What slope is your roof, and what can go on it?

Drag to match your roof, or lay your phone on a rafter in the attic and let its tilt sensor measure it.

Slope limits from Part 9 of the Building Code, Table 9.26.3.1 (asphalt shingles 1 in 3 standard, 1 in 6 with the low-slope method; cedar shakes 1 in 3; profiled metal 1 in 4 unless made for lower slopes).

Price and timing

What moves the price of a new roof

We give you a written, itemized price after a free inspection. These are the things that move it.

Size and shape

Price follows the number of squares, but shape matters as much. A simple gable on a two-storey house is the most efficient roof there is. Hips, valleys, dormers, turrets and several roof levels all add cutting, flashing and waste, which is why two houses with the same floor area can have very different quotes.

Pitch and height

On a slope up to about 6/12 a roofer can work safely with fall protection. Above that, every pass needs roof jacks and staging, and very steep roofs need staging on each course. Three storeys or a difficult driveway also add time.

Layers and deck

A roof with two old layers costs more to tear off and dispose of. Deck replacement is priced per sheet; your quote should say the price per sheet, and we show you a photo of every one we replace.

Material line and extras

Upgrading the shingle line, adding ice and water over the whole roof, new eavestroughs, skylight replacement or extra ventilation are all line items you can choose. They should never be buried inside a single total.

When to book

Spring and early autumn are the busiest months. A roof can be done in winter with the right precautions, and we book the start date after the 10-day cooling-off period if you sign at home, as Ontario's Consumer Protection Act allows.

Replacement day

What happens on your roof

The same sequence on every job, so you always know what stage we are at.

  1. STEP 01

    Protect

    Tarps over beds and shrubs, plywood against siding and windows, the bin placed on boards.

  2. STEP 02

    Tear off a section

    Only as much as we can close the same day, so the house is never left open overnight.

  3. STEP 03

    Deck check

    Every sheet walked; soft or rotted wood replaced and photographed.

  4. STEP 04

    Edges and membrane

    Drip edge, then ice and water at the eaves, valleys and around every penetration.

  5. STEP 05

    Underlayment and starter

    Lapped synthetic underlayment, then the sealed starter course.

  6. STEP 06

    Shingles and flashing

    Courses nailed to pattern, step and counter flashing woven in, new pipe boots.

  7. STEP 07

    Vents and caps

    Ridge vent and soffit intake balanced; hips and ridges capped.

  8. STEP 08

    Clean and hand over

    Magnet sweep, eavestroughs cleared, walk-through, photo report and warranties.

Worth knowing

Permits, insurance and the paperwork you keep

Installing asphalt shingles on a roof is on the City of Ottawa's list of projects that do not need a building permit, so a straight reshingle does not. Replacing rafters, changing the roof shape, adding a dormer or installing solar panels does. If your job needs a permit, we arrange it and book the inspections.

Ontario's advice to homeowners is to get three written quotes, check references, keep the deposit to about 10% and never pay the full amount before the work is complete. We agree with all of it. Our quotes name every layer so you can compare them line by line, and we are glad to see a competitor's quote next to ours.

When the job is done you get a folder (paper or PDF) with the photo report, our 10-year workmanship warranty, the registered manufacturer warranty where the roof qualifies, and the receipts for the materials. Keep it with the house papers; buyers and insurers ask for it.

Questions

Common questions

How long does a roof replacement take?

Most Ottawa houses take one to three days. A simple gable bungalow can be done in a day; a large two-storey with hips, dormers and a chimney, or a roof with two old layers, takes longer. Weather can add a day; we never leave a section open overnight.

Can you put new shingles over my old ones?

We do not. A tear-off is the only way to see and fix the deck, to install eave protection properly and to give the new shingles a flat base. It also keeps the weight of the roof where it was designed to be.

Do I need to be home?

Not for the work itself, but we ask for access to the attic and an outdoor outlet, and we like to walk the finished roof with you. Cars should be out of the driveway on tear-off day.

Will you replace rotten wood?

Yes. Rotted or soft sheathing is replaced as we find it, at the per-sheet price written in your quote, and every sheet is photographed so you can see why.

Which shingles do you recommend?

For most Ottawa homes, an architectural shingle from the GAF or IKO lines we are certified to install. The right line depends on your budget, the look of the house and how long you plan to stay; we bring samples to the estimate. If you are planning to stay a long time, ask us about metal roofing in Ottawa as well.

What if it rains during the job?

We watch the forecast and only open what we can close. If a shower comes through, the open section is covered with membrane or tarps within minutes.

Sheet 09 · Request

Book a free roof inspection

Tell us what is going on and the best number to reach you. Leaks and storm damage get a call back first, day or night.

Emergencies
24/7 emergency calls
Pricing
Upfront, itemized written pricing
Warranty
10-year written workmanship warranty

We reply by phone. Your details are only used to answer this request.

Call 613-851-783124/7 for leaks